Emergency & Exit Lighting in NJ

Emergency and exit lighting isn’t optional – it’s life-safety code, and inspectors check it. Voltus Energy Solutions installs, tests, and maintains emergency and exit lighting for commercial and institutional buildings across New Jersey, keeping you compliant and your occupants safe.

What we provide

  • Exit sign and emergency light installation
  • Required testing, inspection, and documentation
  • Repairs and battery replacement
  • Code-compliance corrections

Why choose Voltus

A licensed New Jersey electrical contractor who keeps your life-safety systems compliant and inspection-ready, with the documentation to prove it. Licensed & insured, NJ license #34EI01906000.

Request service or call (973) 382-9995. Serving Essex, Union and Morris counties, NJ.

Voltus provides commercial, industrial, and institutional electrical service across New Jersey and Eastern Pennsylvania. See our government and institutional capabilities and our service areas.

Frequently asked questions

Are emergency and exit lights required by code?

Yes. Commercial buildings must have working exit signs and emergency egress lighting under New Jersey and NFPA code.

Do you test and certify emergency lighting?

Yes. We test, repair, and document emergency and exit lighting to keep you inspection-ready.

Can you retrofit old exit signs to LED?

Yes. LED exit signs and battery-backup units are more reliable and far cheaper to run.

Your testing obligations in New Jersey

Emergency and exit lighting is not install-and-forget. Under the Life Safety Code as adopted in New Jersey, every emergency light and illuminated exit sign in a commercial building has to be tested on a schedule, and the records have to exist when an inspector asks for them.

  • Monthly: a functional test of at least 30 seconds on every unit, confirming it illuminates on loss of normal power.
  • Annually: a full-duration test of 90 minutes, confirming the battery still carries the fixture for the required time. This is the test that finds dead batteries, and it is the one most often skipped.
  • Records: written results kept and available for inspection. A fixture that works is not compliance on its own; the documentation is part of the requirement.

Self-testing and self-diagnostic fixtures handle the monthly test automatically and flag failures on the unit, which is usually the cheaper answer in a building with a lot of fixtures. We can specify those on replacement.

Voltus performs and documents both tests as part of a maintenance agreement, so the paperwork is ready before the fire official asks. Call (973) 382-9995.

Scroll to Top